 Tire Changing Pads


Geothermal Power Plants

This project required careful planning and layout including forming and pouring 176 individual footings for the equipment of the power plant with tolerances as tight as 1/8th of an inch. The project required a construction pad for the work area which included moving 50,000 cubic yards of material, some of which had to be blasted to be removed.


Milk of Lime Plant:

Site work, underground piping and concrete for lime storage solution going to leach pad. Installed owner furnished equipment including lime storage container; crushing equipment and screw conveyors; structural steel; 18-inch to 36-inch HDPE piping; 30” carbon steel pipe.


Vent Shaft:

Canyon subcontracted to AMEC-Foster Wheeler to place concrete foundations for numerous pieces of equipment, including the mine air heaters, building pads, and the collar around the vent shaft.  Underground utilities were also installed. 


Tailings Pad


Tuscarora Geothermal Powerplant Expansion


Concrete Containments


Reclaim Ramp