Structural Steel Projects
Vent Shaft:
This project was the erection of an 80 foot head frame for Thyssen Mining Company over Air Vent Shaft No. 3 at a local mine site.
![P6210359.jpg](https://images.squarespace-cdn.com/content/v1/5e7bd5656d9d0f2e31ca8e22/1585632342016-SUNKCJN1XB4ZKVWWMB3K/P6210359.jpg)
![3113leeville 004.jpeg](https://images.squarespace-cdn.com/content/v1/5e7bd5656d9d0f2e31ca8e22/1585632343358-3NORWIRQUYFQHPGVZFLA/3113leeville+004.jpeg)
![DSCN1190.jpeg](https://images.squarespace-cdn.com/content/v1/5e7bd5656d9d0f2e31ca8e22/1585632343579-ZAI5KRKS6UGP1OF1PSS3/DSCN1190.jpeg)
Modifications to Aggregate Crusher:
Modifications were designed and constructed for an aggregate crusher at a local mine site, including modifying stairs and platforms, and redirecting conveyors and radial stackers.
![crusher2.jpg](https://images.squarespace-cdn.com/content/v1/5e7bd5656d9d0f2e31ca8e22/1594762541395-LCMFY72JPXMUQYUE522O/crusher2.jpg)
![crusher3.jpg](https://images.squarespace-cdn.com/content/v1/5e7bd5656d9d0f2e31ca8e22/1594762541547-XCN1XLARGK0KKGX0J9GH/crusher3.jpg)